Baosteel Project A Inspection Expert Group
For the four beam casting crane project undertaken by our group
Perform a check
During A inspection
The expert group listened to the work report of the project team
Reviewed relevant materials
Inspected the manufacturing and operation of lifting equipment on the spot
After full discussion and demonstration by the expert group
Agreed
The materials submitted by the project team are complete and detailed
The lifting equipment is well made and operated
The quality control meets the requirements of various A inspection indexes
It is agreed that the project passes the a inspection
Promote the great development of the steel industry
Baosteel project successfully passed expert A inspection